How do I coordinate a kitchen equipment delivery that cannot use the passenger lift?
Establish the item's dimensions and weight, then ask the building what routes exist: a service lift, a stair, an external hoist or a route before a wall is closed. Resolve it before the equipment is ordered, not when it arrives.
Quick Answer
Establish the item's dimensions and weight, then ask the building what routes exist: a service lift, a stair, an external hoist or a route before a wall is closed. Resolve it before the equipment is ordered, not when it arrives.
Measure the item and the route
Get the crated dimensions and weight from the supplier, and ask whether the item can be dismantled or delivered in sections.
Measure every constraint on each possible route: lift car and door, stair width and turns, door openings, corridor width and any threshold or level change.
Ask the building what is permitted
Ask management which routes may be used for equipment, at what times, with what protection and what notice.
Ask whether a service lift exists and its dimensions and load limit, and what happens if it is out of service on the delivery day.
Consider the alternatives early
Ask whether the equipment can be brought in before a partition, a door frame or a shopfront is installed. Sequencing is usually the cheapest answer and only works if planned.
Ask about external access: a window opening, a hoist or a crane, and what permissions, road closures or supervision that would require. These take time to arrange.
Ask the supplier whether they have delivered to a similar location before and how it was done. Equipment suppliers deal with constrained access regularly and can often describe a method that the fit-out team, working from the building alone, would not propose.
Plan the day properly
Agree who attends, who supervises, what protection is fitted and what the contingency is if the route proves impossible.
Ask about removal at the end of the equipment's life, since the same constraint will apply again.
Record the dimensions, the agreed route and the permissions in writing before ordering. This avoids a very expensive discovery; lifting operations, structural capacity and any safety or regulatory requirement remain matters for the qualified specialists and the relevant authorities.
Need help with your property?
Discuss your project with MANZIL
Tell us where your restaurant / café is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.