Identify the largest items before the shopfront is designed, and check they can pass through the finished opening. Where they cannot, plan to bring them in before the front is installed, or design a removable section.

Quick Answer

Identify the largest items before the shopfront is designed, and check they can pass through the finished opening. Where they cannot, plan to bring them in before the front is installed, or design a removable section.

Measure the largest items first

List the largest fixtures, equipment and stock items with their dimensions including packaging, and note whether any can be dismantled.

Compare these against the proposed finished opening, including the door leaf, any central mullion and the height under any header or shutter housing. The finished opening is almost always smaller than the structural one.

Plan the sequence around the largest items

Ask whether the largest items can be delivered before the shopfront is installed. This is usually the simplest answer and costs nothing if it is planned rather than discovered late.

Where that is not possible, ask whether a panel or a section of the front can be designed to be removed, and what that costs. Ask this before the shopfront is manufactured.

Check the whole route, not just the front

Check the route from the vehicle to the shop: the centre's corridors, any service lift, doors, turns and thresholds. The shopfront may not be the narrowest point.

Ask management about permitted delivery routes and times for large items, and whether any restriction applies that would rule out a route you were assuming.

Ask whether any large item could be delivered in sections and assembled inside. Suppliers of counters, display units and equipment can often split a unit for transport, and asking before manufacture is far cheaper than dismantling a finished shopfront.

Plan for the future, not only the opening

Consider replacement: equipment that goes in before the front is installed cannot easily come out afterwards, which matters at the end of its life.

Record the largest dimensions, the route and the agreed method in writing, and give them to the shopfitter and suppliers. This prevents an expensive discovery; structural, fire and centre requirements remain matters for the appointed consultants and the management.

Need help with your property?

Discuss your project with MANZIL

Tell us where the retail / shop is, what exists today and what you’re planning.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact