My Existing Warehouse Layout Doesn't Match the Approved Drawings. What Should I Do?

A clear comparison can turn a confusing set of drawings into a useful review brief. Label approved, existing and proposed conditions separately.

Illustrative technical drawings used for warehouse project planning.
Coordinate existing records and proposed drawings; illustrated sheets are not approved documents.AI-generated illustration for MANZIL · Not a real project photograph.

Quick Answer

Separate the approved, existing and proposed or rectified layouts, then identify the differences and their significance. A current-condition drawing does not itself regularize the work, and different discrepancies can need different resolutions.

Separate the three versions of the warehouse

When the existing layout differs from the approved drawings, begin by separating the approved, existing and proposed or rectified conditions. They answer different questions. An accurate survey of what stands today does not, by itself, show that it has been approved.

Check that the approved documents relate to the correct plot and unit and look for later revisions. An apparent discrepancy may reflect missing records, an actual alteration or both. Avoid treating the first drawing found in a file as conclusive evidence of the latest accepted arrangement.

Build a comparison that can be reviewed

  • Approved: the available accepted drawing and its revision or reference.
  • Existing: the actual layout, documented with appropriate survey information and photographs.
  • Proposed / rectified: the arrangement being put forward for review, clearly marked as a proposal.

Use consistent orientation and room or area descriptions when comparing them. Mark differences rather than redrawing everything as if it had always been present. Keep original records intact and identify who prepared each current-condition or proposed document.

Illustrative internal block partition with a doorway inside a warehouse.
AI-generated editorial illustration. Not an approved layout, structural detail or fire-system design.AI-generated for MANZIL · Illustrative only, not a real project photograph.

Describe more than the wall positions

Record differences in doors, shutters, offices, ceilings, circulation and occupied areas as well as partitions. Explain actual uses and whether separate tenants or activities have been introduced. A wall discrepancy can be part of a wider change in how the warehouse operates.

Include known service alterations and missing information. Where the construction or system condition is uncertain, ask an appropriate professional what investigation is needed. Do not guess concealed details to make the drawing look complete or assign a fire performance from appearance.

Determine the significance of each discrepancy

Not every difference has the same resolution. The project team should assess the relevant architectural, structural, fire-safety and MEP implications and establish the applicable jurisdiction.

Do not assume that updating an as-existing drawing regularizes the building. Similarly, copying an old plan and removing anything that differs is not automatically the correct response. A coordinated review should establish what can remain, what needs further evidence and what action is proposed.

Prepare the next discussion

  • Collect available approved drawings and subsequent modification records.

  • Identify the correct unit, dates and revision history.

  • Record the actual condition, use and occupation clearly.

  • List differences and unknown details without concealing them.

  • Ask for a proposed route and the information needed to confirm it.

Keep the resulting action plan linked to specific drawing versions. If a revised proposal is prepared, distinguish it from both the original approval and the current-condition record. Confirm how any accepted changes and completion are to be documented. The aim is a traceable comparison and an appropriate resolution, not simply a set of drawings that visually match the building while its status remains uncertain.

Need help with your property?

Need to compare approved and existing layouts?

Tell us where your warehouse is, what records you have and how the partition is currently being used.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types

Official sources

Sources used to support this answer.

  • Dubai legislation

    Decree No. 45 of 2021 concerning the Dubai Building Code — general framework

    Source checked Sept 2026Currentness not established

    View official source
  • PCFC / Trakhees

    Unified Digital Building Permits Services — modification and document-copy context

    Source checked Sept 2026Currentness not established

    View official source
Contact