What should I ask before phasing a common-area refurbishment by floor?
Ask what each phase leaves usable, how residents move through the building during it, and what the arrangement is where a floor is partly complete. Phasing by floor sounds straightforward and usually creates issues at the junctions between phases.
Quick Answer
Ask what each phase leaves usable, how residents move through the building during it, and what the arrangement is where a floor is partly complete. Phasing by floor sounds straightforward and usually creates issues at the junctions between phases.
Ask what remains usable
Ask which lifts, stairs, corridors and facilities remain available during each phase, and what the alternative is where one is closed.
Ask how long each phase lasts and how firm that estimate is, since residents tolerate a defined period far better than an open-ended one.
Ask about the junctions between phases
Ask what happens where a completed floor meets one still being worked on: the lift lobby, the stair and the corridor ends.
Ask how the completed areas are protected from continuing work, since traffic through a finished corridor to reach an unfinished one causes most of the damage.
Ask about the practical arrangements
Ask about access for residents with mobility needs during each phase, and what arrangement applies if a lift is out of use.
Ask about noise, dust, working hours and how residents are informed of what is happening each week.
Ask what happens to residents' expectations between phases, since those on later floors wait considerably longer for the same result. Communicating the whole programme at the start is more effective than announcing each phase as it begins.
Ask about the finish across phases
Ask how consistency is maintained across phases carried out months apart: material batches, colour matching and the availability of the same products.
Ask whether a batch of material should be secured at the start for the whole project.
Ask what happens if the project pauses between phases, since part-completed common areas can remain that way for a long time and the arrangement should anticipate it. This makes phasing workable; escape routes, accessibility during the works and any regulatory requirement remain matters for the appointed consultants and the relevant authorities.
Need help with your property?
Discuss your project with MANZIL
Tell us where your residential building is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.