What should I do if the delivered furniture obstructs a planned access route?

Stop the installation in that area and check the layout drawing against what was delivered before anything else is placed. Establish whether the furniture, the drawing or the route is wrong, since the remedy differs entirely.

Quick Answer

Stop the installation in that area and check the layout drawing against what was delivered before anything else is placed. Establish whether the furniture, the drawing or the route is wrong, since the remedy differs entirely.

Stop and measure

Stop placing furniture in the affected area and measure the actual clear route against the drawing.

Photograph the situation with a tape in place, so the obstruction is documented rather than described.

Establish where the difference arose

Check whether the furniture matches the dimensions on the approved layout, since delivered items sometimes differ from what was drawn.

Check whether the layout itself showed an adequate route, and whether the route was defined by a requirement such as an escape route or an accessible route.

Ask what the route requires

Ask the designer what the route was intended to provide and whether a minimum applies, since an escape or accessible route is not a matter of preference.

Do not decide yourself that a narrower route is acceptable. Ask who confirms it.

Ask whether the route obstruction affects any fire or escape provision, and stop using the area until that is confirmed by someone qualified. This is not a question to resolve between the furniture supplier and the site team.

Agree the remedy

Ask for options: relocating furniture, changing an item, reducing the quantity or altering the layout, with the consequence of each.

Agree who bears the cost, based on where the discrepancy arose, and record the position before the remedy proceeds.

Ask whether the same problem affects other areas of the same layout, since a dimensional error or a delivery difference usually repeats across the floor rather than occurring once. This keeps the remedy considered; escape routes, accessible routes and any regulatory requirement remain matters for the appointed consultants and the relevant authorities.

Need help with your property?

Discuss your project with MANZIL

Tell us where your office is, what records you have and how it is currently being used.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact