How do I keep a cancellation quotation separate from the cost of replacement work?

Keep them as two separate records: what ending the original arrangement costs, and what the replacement work costs. Merging them produces a single figure that cannot be checked and makes any later discussion much harder.

Quick Answer

Keep them as two separate records: what ending the original arrangement costs, and what the replacement work costs. Merging them produces a single figure that cannot be checked and makes any later discussion much harder.

Get the cancellation priced on its own

Ask the original contractor or supplier for a written statement of what is due on cancellation, itemised: work carried out, materials ordered or made, costs committed to others, and anything else claimed.

Ask for evidence of committed costs rather than a single figure. Items already manufactured or ordered are verifiable; general claims are not.

Ask what you receive for it

Ask what you get in exchange for the cancellation payment: materials delivered, completed items, drawings or survey information. Anything you have paid for should come to you where that is possible.

Ask whether partially completed items can be delivered, since they may be usable by the replacement contractor and reduce the overall cost.

Price the replacement separately

Ask the new contractor to price the remaining work as its own scope, stating what they assume about the condition of the work left behind.

Ask them to record what they found when they took over, with photographs. This protects both of you and keeps the two positions distinct.

Ask the new contractor to price the work twice where practical: once assuming they can use what was left, and once assuming they remove it. The difference tells you what the partially completed work is actually worth to you, which is the figure the cancellation discussion needs.

Keep two files

Maintain separate records: one for the terminated arrangement and one for the replacement. Each should contain its own correspondence, quotations, payments and evidence.

Record the date of the changeover and the state of the work at that point. This keeps both positions clear; entitlement on cancellation and any question of liability are matters for your own legal and commercial advisers.

Need help with your property?

Discuss your project with MANZIL

Tell us where your villa is, what records you have and how it is currently being used.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact