How do I plan network coverage before ceilings and walls are closed?

Plan the cabled outlets before ceilings and walls close, because adding a cable afterwards means opening up finished construction. Ask where equipment will be needed, where wireless coverage is likely to be weak, and what the walls are made of.

Quick Answer

Plan the cabled outlets before ceilings and walls close, because adding a cable afterwards means opening up finished construction. Ask where equipment will be needed, where wireless coverage is likely to be weak, and what the walls are made of.

Decide where cables must reach

List the positions needing a fixed connection: televisions, desks, printers, access points, cameras, control panels and any equipment that performs better on a cable.

Add positions you may want later. A cable installed now to an unused outlet costs very little; the same cable added afterwards involves chasing, patching and redecorating.

Ask about the building itself

Tell the installer what the walls and floors are made of, since dense construction, metal framing and foil-backed materials affect wireless coverage considerably.

Ask where access points would be positioned and whether those positions are reachable with a cable. Access points fixed in ceilings must be cabled before the ceiling is closed.

Think about the whole property

Note the areas that matter: rooms where people work, outdoor areas, a gate or entrance, a store or a service area. Coverage expectations should be stated rather than assumed to be everywhere.

Note any area that is separated by a distance, a thick wall or an external gap, since these usually need their own cabled point rather than a repeater.

Ask how many devices will actually be in use at once, including televisions, computers, phones, cameras and controls. Coverage and capacity are different questions, and a property with good coverage can still perform poorly when many devices are used simultaneously.

Agree the record and the provision

Ask for a drawing showing every cable route and outlet, and for photographs before the walls and ceilings are closed.

Ask for spare capacity in containment and for cables to be labelled at both ends. Keep the drawing with your property records. This avoids opening up finished work later; the network design, cable specification and installation remain matters for the qualified installer.

Need help with your property?

Discuss your project with MANZIL

Tell us where the villa is, what exists today and what you’re planning.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact