How do I record reinforcement locations inside a partition before it is closed?

Photograph every reinforcement, noggin and fixing plate before the partition is boarded, with measurements from a fixed reference such as a corner or floor level. Once the wall is closed, this information cannot be recovered without opening it.

Quick Answer

Photograph every reinforcement, noggin and fixing plate before the partition is boarded, with measurements from a fixed reference such as a corner or floor level. Once the wall is closed, this information cannot be recovered without opening it.

Photograph before boarding

Take photographs of the open framing showing each piece of reinforcement in position, with enough of the room visible to locate it.

Include a tape measure or marked staff in the image showing the height from floor level and the distance from a corner, so the position can be found later.

Record what each is for

Note the intended purpose of each reinforcement: a wall-hung unit, a television, a handrail, a screen, a cabinet or a grab rail.

Record the material and size of the reinforcement, since that determines what can safely be fixed to it. Ask the contractor to confirm rather than assuming.

Produce a simple location record

Draw a rough elevation of each wall marking the reinforcement positions with dimensions. A sketch is sufficient and is far easier to use than photographs alone.

Reference each wall consistently using room names and a compass direction or a fixed feature, so the record is unambiguous.

Ask the contractor to confirm the reinforcement positions against your list of wall-mounted items before boarding, room by room. A reinforcement installed in the wrong position is as unhelpful as none at all, and the check takes only a few minutes per room.

Keep it where it will be found

File the photographs and sketches with your property documents, labelled by room and wall.

Give a copy to anyone installing wall-mounted items later, and to any future contractor working in the property.

Ask the contractor to confirm that all required reinforcement was installed before boarding, against the list of items to be fixed. This is one of the most valuable records a project produces; the adequacy of any fixing and the loads it can carry remain matters for the qualified professionals.

Need help with your property?

Discuss your project with MANZIL

Tell us where your office is, what records you have and how it is currently being used.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact