Ask what is known about the villa's construction, past repairs and concealed conditions, which parts of the work could reveal surprises, and how discoveries will be handled and…
Ask what the marking means on this project, what is still expected to change, and which decisions you can safely make from the document. Preliminary information is useful for…
Ask which functions continue to work without the supplier's service, and which stop. Ask whether the equipment can be controlled locally, whether it works with other systems, and…
Ask what each proposal requires week by week and month by month, who will do it, and what happens if it is not done. A landscape is a commitment to ongoing work, and the proposal…
Ask for every essential function to have a physical control that works without the app, the network or the supplier's service. Test each one yourself before handover, with the…
Ask how long the exact model will be available, whether a later unit would match in colour and appearance, and what happens if the range is discontinued. Record the full product…
Ask where every service enters, runs and needs reaching later: water tanks, pumps, distribution boards, air conditioning equipment, drainage access and meters. Confirm that each…
Ask where the equipment will be located, how it is reached, what it needs in ventilation and power, and who would attend if it fails. Network equipment requires more attention…
List what you actually own and need to keep, with approximate sizes, then ask where each item will live and how it gets there. Bulky storage is almost always underestimated, and…
Ask how many rounds are included at each stage, what a round consists of, what counts as a revision rather than a change, and what happens when the included rounds are used. The…
Ask what the level difference will be at each doorway, how the two floor finishes meet, and whether the junction can be made flush. Raise any wheelchair, walking-aid or trip…
Ask to see a range of pieces rather than one sample, and to view a dry-laid area from the batch allocated to your project. Agree what variation is acceptable, how pieces will be…
Ask which warranties are available, what installed items they relate to and what the issuing provider says about transfer to a new owner. Retain the actual terms and supporting…
Ask what preparation is included, what is assumed about the existing floor, and what happens if the subfloor needs work. A single-day promise usually depends on the floor beneath…
Ask what exactly is being frozen, what is excluded, and what happens if something has to change afterwards. Confirm that the decisions you still owe are listed with dates, and…
Ask how a damaged area is repaired, whether a patch will be visible, and who could carry out the repair in a few years. Request a sample of a repaired area, not only a new one…
Ask where every underground service runs, how deep, how far from the planting position, and who confirms the drawings before any tree is chosen. Large roots and excavation can…
Before signing a ceiling coordination drawing, ask what your sign-off is intended to confirm and which technical reviews remain with the project team. Review visible positions…
Ask the inspector to record the room as inaccessible and explain which parts of the assessment are affected. Then arrange any return access through the responsible property…
Ask what the design has assumed about the missing equipment, which of those assumptions are critical, and when a decision is genuinely needed. Record the assumed size, service…
Plan a villa extension by testing the desired extra space against the existing home, current property constraints and a coordinated construction scope. Begin with the need, not a fixed addition copied from another villa. This guide organises the decisions and supporting questions; it does not confirm a particular extension is permitted or structurally feasible.