What should I ask when the designer relies on measurements taken by a supplier?
Ask who took the measurements, when, and what condition the space was in at the time. Find out whether the designer has checked them independently and who carries the risk if they turn out to be wrong. Record the answers with the drawing that relies on them.
Quick Answer
Ask who took the measurements, when, and what condition the space was in at the time. Find out whether the designer has checked them independently and who carries the risk if they turn out to be wrong. Record the answers with the drawing that relies on them.
Establish the provenance of the dimensions
Request the date of the survey and the name of the company that carried it out. Measurements taken before demolition, before plastering or before floor levelling describe a different space from the one the finished item will occupy.
Ask which surfaces were used as reference points. A dimension taken from an existing wall that will later be tiled or lined moves by the thickness of the new finish, and that difference is often where fitted items fail.
Clarify what has and has not been verified
Ask the designer directly whether they have checked the supplier's figures or accepted them as issued. Both answers can be reasonable, but you need to know which one applies before you approve anything based on those numbers.
Find out whether any dimension is marked as assumed, approximate or to be confirmed on site. Those markings are useful information, not a defect, and they tell you which parts of the design are still provisional.
Ask what happens if the measurement is wrong
Request a plain explanation of who remeasures before manufacture, and at what point the supplier takes responsibility for fit. Many suppliers carry out a final check survey, and the timing of that check affects your programme.
Ask what adjustment the design allows. Some items are made with scribe pieces or tolerance gaps; others are cut exactly and cannot be adapted. Knowing which applies tells you how much a small error will cost.
Keep the record with the decision
Note the answers alongside the relevant drawing or order, including any dimension flagged as unconfirmed. If a later dispute arises about fit, this record shows what everyone understood at the time of ordering.
Ask the designer and supplier to confirm the arrangement in writing before manufacture begins. This keeps responsibility visible; it does not replace the survey, the technical check or the professional judgement of the people carrying them out.
Need help with your property?
Discuss your project with MANZIL
Tell us where the villa is, what exists today and what you’re planning.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.