What should I check in a lighting mock-up before ordering all fittings?

Check the mock-up at night and during the day, with the finishes and furniture positions you will actually have. Look at brightness, glare, shadows, colour on surfaces and how the controls behave. Record what is approved, including fitting model, aiming and dimming, before the full order is placed.

Quick Answer

Check the mock-up at night and during the day, with the finishes and furniture positions you will actually have. Look at brightness, glare, shadows, colour on surfaces and how the controls behave. Record what is approved, including fitting model, aiming and dimming, before the full order is placed.

Recreate realistic conditions

Ask for the mock-up to use the intended ceiling height, fitting positions and beam directions. A fitting tested at the wrong height or angle tells you almost nothing about the effect in the finished room.

Include the finishes, because reflectance changes everything. A pale wall and a dark timber panel under the same fitting produce completely different results, and the mock-up should show the surfaces you have selected.

Look for the problems, not the highlights

Sit and stand where people will actually be, and look for glare from the fitting itself or reflected in screens, glass and mirrors. A layout that photographs well can be uncomfortable to occupy.

Check the shadows on working surfaces, particularly where someone stands between a downlight and the counter. Note dark corners, uneven scallops on walls and any visible difference between adjacent fittings.

Test the controls as well as the light

Dim the fittings slowly through the full range and watch for flicker, colour shift, sudden steps or fittings that switch off at different points. These issues are far easier to resolve before the whole installation is bought.

Try the switching arrangement you expect to use, including any scene settings. Ask what would change if the control system or driver is substituted later, since that substitution is a common source of complaints.

Record the approval precisely

Write down the exact fitting reference, output, colour temperature, beam angle, finish, driver and control type that you approved. A note approving the mock-up without these details cannot be enforced when deliveries arrive.

Ask for the approved arrangement to be marked on the reflected ceiling plan. This protects the agreed result; the electrical design, load, compliance and safe installation remain the responsibility of the qualified designer and contractor.

Need help with your property?

Discuss your project with MANZIL

Tell us where the villa is, what exists today and what you’re planning.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact