What should I record about unoccupied rooms at initial handover?
Record the condition of every room at handover, including those you will not use immediately, with photographs and a written note. Unoccupied rooms are where defects go unnoticed until the period for reporting them has passed.
Quick Answer
Record the condition of every room at handover, including those you will not use immediately, with photographs and a written note. Unoccupied rooms are where defects go unnoticed until the period for reporting them has passed.
Inspect every room, not only the ones in use
Walk every room at handover and record its condition, including stores, plant rooms, guest rooms, roof spaces and anything you do not expect to enter for months.
Photograph each room systematically: floors, walls, ceilings, windows, doors and any fittings.
Record the systems in those rooms
Note whether the lighting, sockets, air conditioning, water outlets and drainage in each unoccupied room have been tested and demonstrated.
Ask whether anything in an unoccupied room needs to run periodically, such as drainage traps drying out or air conditioning running to control humidity.
Record what is not yet complete
Note anything unfinished in those rooms and keep it on the defects list rather than allowing it to be closed because the room is not in use.
Note anything stored in the rooms, including materials left by the contractor, and agree when it will be removed.
Ask whether any unoccupied room should be ventilated, heated or cooled periodically, and what the consequence is of leaving it closed. Rooms shut up for months in a hot climate can develop problems that would never occur in a room in normal use.
Check them periodically
Set a reminder to inspect unoccupied rooms at intervals during the defects period, since a problem that appears there may otherwise be discovered too late to report.
Pay particular attention to water, humidity and anything affecting finishes, which are the usual issues in closed rooms.
Ask how long you have to report defects and diary a full inspection of every room before that period ends, since this is the single most common way an owner loses the benefit of it. This protects your position; the significance of any defect and its remedy remain matters for the qualified professionals.
Need help with your property?
Discuss your project with MANZIL
Tell us where your villa is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.