How do I document a site condition before heavy equipment arrives?
Photograph and describe the site before machinery arrives, covering access routes, surfaces, boundaries, drainage, planting, neighbouring property and any existing damage. Date the record, keep the original files, and share a copy with the contractor so both sides start from the same picture.
Quick Answer
Photograph and describe the site before machinery arrives, covering access routes, surfaces, boundaries, drainage, planting, neighbouring property and any existing damage. Date the record, keep the original files, and share a copy with the contractor so both sides start from the same picture.
Cover the routes as well as the working area
Record the full approach: the road or driveway, kerbs, gates, turning areas and any surface that heavy vehicles will cross. Damage to access surfaces is one of the most common disputes and the easiest to avoid arguing about.
Include the parts of the site that should remain untouched, such as landscaping, paving, external finishes and boundary walls. A record that only covers the excavation zone leaves the surrounding areas undocumented.
Make the record verifiable
Take photographs from consistent positions, wide enough to show context and close enough to show detail. Include something of known size in close-ups, such as a tape or a standard object, so cracks and levels can be judged later.
Keep the original image files with their metadata rather than compressed copies from a messaging app. Add a short written note listing the date, weather, who was present and anything already broken or displaced.
Note existing conditions honestly
List damage that already exists, including hairline cracking, settled paving, stained surfaces and previous repairs. Recording them protects you as much as the contractor, because it shows what was not caused by this work.
Record utility covers, meters, service markers and drainage points, including whether they were accessible. If something is obscured, say so rather than leaving it out of the record entirely.
Agree the record with the contractor
Send the record before work begins and ask for written acknowledgement. Invite them to add anything they think is missing, which turns it into a shared baseline rather than a document produced by one side.
Agree who repeats the record after the work and how differences will be reviewed. This gives a fair basis for discussion; it does not determine liability or assess whether any observed condition is structurally significant.
Need help with your property?
Discuss your project with MANZIL
Tell us where the land / plot is, what exists today and what you’re planning.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.