How do I record changes to external levels during civil works?
Record the levels as surveyed before, during and after the works, with the datum stated, and keep the drawings showing each change. External level changes affect drainage, thresholds and neighbouring land, and they are difficult to reconstruct afterwards.
Quick Answer
Record the levels as surveyed before, during and after the works, with the datum stated, and keep the drawings showing each change. External level changes affect drainage, thresholds and neighbouring land, and they are difficult to reconstruct afterwards.
Record the starting position
Ask for a survey of existing external levels before work begins, stated against a named datum, and keep it with the project records.
Photograph the site at the same time from fixed positions, including the relationship to any boundary, threshold or neighbouring surface.
Record each change as it happens
Ask for changes to be recorded as they occur rather than reconstructed at the end. Ask who is responsible for recording and how often.
Ask for the reason for each change to be noted: a design revision, a drainage requirement, or a condition found on site. The reason is usually more useful later than the measurement alone.
Watch the points that matter
Pay particular attention to levels at thresholds, at drainage points, along boundaries and where surfaces meet an existing structure.
Ask what the change means for water flow, and ask the consultant to confirm that surface water still goes where it should. Level changes are the usual cause of water arriving somewhere it did not before.
Ask who is responsible for confirming that the finished levels match the approved design, and for reporting any departure. A change made on site for a practical reason is often entirely sensible, but it needs to be recorded and checked rather than simply built.
Record the finished position
Ask for a final survey of external levels against the same datum, and for a drawing showing the finished arrangement.
Photograph the completed areas from the same fixed positions as the original record.
Keep the surveys, drawings and photographs together with the datum clearly stated. This preserves a record that is otherwise impossible to recover; drainage design, level requirements and any effect on neighbouring land remain matters for the appointed consultants.
Need help with your property?
Discuss your project with MANZIL
Tell us where your land / plot is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.