Record each test with its exact location, referenced to a fixed grid or survey point, the depth or level, the date and the result. Locations recorded loosely cannot be matched to the finished ground, which defeats the purpose of testing.
Quick Answer
Record each test with its exact location, referenced to a fixed grid or survey point, the depth or level, the date and the result. Locations recorded loosely cannot be matched to the finished ground, which defeats the purpose of testing.
Fix a reference system first
Agree the coordinate or grid reference used for the earthworks, tied to a permanent survey point, and use it for every test.
Record the level as well as the plan position, since a test at the wrong depth tells you about a different material.
Record each test properly
Record the date, the test type, the position and level, who carried it out and the result, with a photograph of the location.
Mark the location physically where it can be found, but do not rely on the marker, since markers are removed by the works.
Record what was being tested
Record what layer or material was tested and what stage of the earthworks it belonged to, since a result is only meaningful in relation to that.
Note the conditions, such as weather and moisture, if they were recorded.
Ask your engineer whether any test location should be repeated because the ground was subsequently disturbed. A test valid when carried out may no longer represent the ground in that position after later works, and that is worth checking before anything is built on it.
Match them to the completed ground
Ask for a plan showing all test locations against the finished layout, and check that the coverage makes sense.
Check that the tests are distributed across the areas that matter, including any area later built on, rather than concentrated where access was easy.
Keep the results, the plan and the survey reference together with the project records, and ask your engineer what coverage they consider adequate, since that judgement is theirs. This preserves the evidence; the adequacy of testing and the significance of any result remain entirely matters for the qualified engineer.
Need help with your property?
Discuss your project with MANZIL
Tell us where your land / plot is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.