What should I ask when a supplier changes the batch or finish code after ordering?
Ask why it changed, how the new reference differs from the approved sample, and to see a physical sample from the new batch before anything is delivered. Do not accept a change on the basis of a code alone.
Quick Answer
Ask why it changed, how the new reference differs from the approved sample, and to see a physical sample from the new batch before anything is delivered. Do not accept a change on the basis of a code alone.
Ask what changed and why
Ask whether the original was discontinued, unavailable in the quantity required, or replaced by a revised product. The reason tells you how much difference to expect.
Ask whether the change affects appearance, performance, dimensions or all three. A batch change may be purely a production reference, or it may be a materially different product.
Ask for a physical sample
Ask for a sample from the actual batch being supplied, and compare it against the approved reference in the same light and at the same scale.
Where the material varies naturally, ask for several pieces rather than one. A single favourable piece from a batch tells you very little about what will arrive.
Check what is already installed
If any of the original material is already installed, compare the new batch against the installed work rather than only against the retained sample.
Ask whether the remaining quantity can come from the original batch, even partially, and whether the different batches can be used in separate areas where a difference would not be seen.
Ask what quantity is being supplied from the new reference and whether any spare material is available from it. Where a batch change is unavoidable, holding a small reserve from the same batch protects you against a future repair that would otherwise be visibly different.
Record the decision
Record what was approved originally, what is now proposed, what you compared and what you accepted, with photographs and dates.
Ask for the order and delivery documents to show the batch actually supplied. This keeps appearance under control; the technical equivalence of any substituted product remains a matter for the supplier and the responsible professionals.
Need help with your property?
Discuss your project with MANZIL
Tell us where your villa is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.