What should I include in a decision log for a property project?
Record each decision with its date, what was decided, who decided it, what it was based on and what it affects. One line per decision, kept in one place, saves more argument later than any other project document.
Quick Answer
Record each decision with its date, what was decided, who decided it, what it was based on and what it affects. One line per decision, kept in one place, saves more argument later than any other project document.
Record the decision and its basis
Write what was decided in specific terms: the product reference, the position, the dimension or the option chosen. A log entry saying the kitchen was agreed is not usable six months later.
Record what it was based on: a drawing revision, a sample, a quotation or a discussion. When a question arises about why something was done, the basis is usually what resolves it.
Record who decided and when
Note the date and the person who made the decision, and who else was informed. Where a decision was made by someone acting on your behalf, record that too.
Include decisions you made to do nothing, such as declining an option or deferring an item. These are frequently forgotten and then revisited from scratch.
Record what it affects
Note which drawings, orders or trades the decision affects, and whether any of them still need to be updated. This turns the log into a working checklist rather than a historical record.
Where a decision has a cost or programme consequence, note it and whether that consequence was agreed separately.
Review the open items in the log at each project meeting rather than only the completed ones. A decision recorded as taken but never carried into a drawing or an order is the most common failure of a project log, and a short standing review catches it while it is still cheap to correct.
Keep it in one place and current
Use a single document that everyone refers to, rather than tracking decisions through message threads. Decisions spread across several conversations are effectively lost.
Update it at the time rather than at the end of the week, and bring it to project meetings. This keeps the project coherent; the technical and commercial consequences of any decision remain matters for the appointed professionals to advise on.
Need help with your property?
Discuss your project with MANZIL
Tell us where the villa is, what exists today and what you’re planning.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.