What should I record when temporary protection damages an existing finish?

Record it immediately as damage rather than as part of general making good. Photograph the affected finish with the protection still in place if possible, note when it was fitted and removed, and report it in writing the same day.

Quick Answer

Record it immediately as damage rather than as part of general making good. Photograph the affected finish with the protection still in place if possible, note when it was fitted and removed, and report it in writing the same day.

Photograph before anything is disturbed

Take images with the protection partly in place, showing the relationship between the two. Once the protection is fully removed, it becomes difficult to demonstrate that it caused the mark.

Include a wide view for location and a close view for detail, with something for scale. Note the date and the room.

Record the history of the protection

Note what was fitted, by whom, when, and what was used to hold it down. Tapes and adhesives are a common cause of damage to paint, timber, stone and vinyl.

Note anything that happened while it was down: water, heavy traffic, stored material or heat. This helps the responsible party understand the cause rather than dispute the event.

Report it separately from snagging

Send the report as its own item rather than adding it to a general defects list. Damage caused during the works and defects in new work are different issues with different remedies.

Ask the contractor to inspect it promptly while the evidence is intact, and record their response.

Ask whether the protection should be replaced or changed for the remainder of the work. Continuing with the same arrangement after it has already caused damage usually produces a second claim about the same finish, which is much harder to resolve.

Ask about the repair before it starts

Ask what repair is proposed and whether it will match the surrounding finish. A patched repair on an existing floor or wall is often visible, and the acceptable outcome should be agreed in advance.

Keep the photographs, the report and the response together. This preserves the evidence; determining the cause, the appropriate repair and responsibility for the cost remain matters for the responsible professionals and your advisers.

Need help with your property?

Discuss your project with MANZIL

Tell us where your villa is, what records you have and how it is currently being used.

WhatsApp MANZIL

MANZIL Approvals

Not sure which approvals apply to your property?

Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.

Explore MANZIL Approvals

Explore by property

More answers for the place you’re working on.

View all property types
Contact