What should I request when concrete test results are missing from the project file?
Ask the contractor and the testing organisation for the records directly, identifying the pour by date and location. Ask what testing was carried out, who holds the results, and what happens if no record exists.
Quick Answer
Ask the contractor and the testing organisation for the records directly, identifying the pour by date and location. Ask what testing was carried out, who holds the results, and what happens if no record exists.
Identify what should exist
Ask your consultant what records are normally produced for the concrete work on your project, and which of them you should hold.
Identify the specific pours by date and location, so the request is precise. A general request for concrete records rarely produces anything useful.
Ask the parties who would hold them
Ask the contractor first, then the concrete supplier and the testing organisation. Results are frequently issued to one party and never forwarded.
Ask for delivery documentation as well as test results, since these identify what was supplied and when.
Ask what happens if nothing exists
Ask your consultant what it means if no record can be produced for a particular pour, and what options exist.
Ask whether any assessment of the completed work is possible and what it would involve. That is a technical question for the engineer, and the answer depends on what was built and its importance.
Ask whether the same gap affects other records on the project, such as certificates or inspection reports. A single missing document is often an isolated oversight, but it can also indicate that records were not being collected systematically, which is worth establishing early.
Deal with it while you can
Raise the gap in writing while the contractor is still engaged, since obtaining records afterwards is considerably harder.
Ask for the outstanding records to be listed as an open item with a date, and follow it through to completion.
Keep whatever is produced with the project records, organised by location and date. This preserves the evidence trail; the significance of any missing record and the adequacy of the constructed work remain entirely matters for the qualified engineer.
Need help with your property?
Discuss your project with MANZIL
Tell us where your villa is, what records you have and how it is currently being used.
WhatsApp MANZILMANZIL Approvals
Not sure which approvals apply to your property?
Explore general guidance for your property, planned work and location. Project-specific approvals still need verification.
Explore MANZIL ApprovalsExplore by property
More answers for the place you’re working on.