How do I document a site condition before heavy equipment arrives?
Photograph and describe the site before machinery arrives, covering access routes, surfaces, boundaries, drainage, planting, neighbouring property and any existing damage. Date…
A new build, an extension or a major addition.
8 published items
Photograph and describe the site before machinery arrives, covering access routes, surfaces, boundaries, drainage, planting, neighbouring property and any existing damage. Date…
Record the levels as surveyed before, during and after the works, with the datum stated, and keep the drawings showing each change. External level changes affect drainage…
Record quantity, appearance, origin and destination as plain observations, with photographs and dates, and let the contractor's qualified people classify the material. Ask for…
Record each test with its exact location, referenced to a fixed grid or survey point, the depth or level, the date and the result. Locations recorded loosely cannot be matched to…
Agree in writing what the access route looked like before, what standard it will be restored to, who inspects it and when. Confirm whether temporary surfaces, gates, fencing and…
Compare site-investigation proposals by the questions they will answer, the information they assume, access and reinstatement arrangements, and the reports and professional…
Explain the activity you want the land to support before commissioning site studies. Describe what will be built, how the site will operate and which decisions are still open.…
Before planning a new building around assumed services, confirm what information exists about the proposed utility connections and ask the project team what remains unverified.…