Work from the sample record rather than memory: the labelled photographs, the approval note, and the product details recorded at the time. Where no retained sample exists, ask…
Record every asset installed with its location, make, model, serial number, installation date, warranty and maintenance requirement. Without this list, the refurbished areas…
Organise them by system and location with a one-page index, so a new manager could find what is needed without you. Include drawings, certificates, test records, warranties…
Organise the visit by trade and by room, and ask each trade only about their own work. Record what you observe without attributing a cause, and let the contractor or consultant…
Agree the inspection method, prepare a room-by-room checklist, gather the approved drawings and specification, and ask what evidence the contractor will provide for hidden and…
Keep two lists. Cosmetic items are appearance defects to be corrected; unresolved electrical items are open technical issues that may need testing, investigation or…
When a defect appears after the building team has left, report the location, observed problem and timing to the appropriate project or service contact, with the relevant handover…
Keep the original item open rather than raising a new one each time. Record every occurrence and every repair against that single entry, with dates, photographs and what was…
Ask for a demonstration of every system you will operate: cooling, hot water, water treatment, ventilation, controls, lighting scenes, security, irrigation, pool equipment and…
Ask for the system documentation, the account credentials in your name, the programming details, the device list and a written explanation of how to make ordinary changes.…
Request a marked drawing showing the route, depth and material of every buried service, photographs taken in the open trench, and the records of any testing or inspection. Once…
Ask what the warranty covers as an assembly: which layers, which details, which penetrations and which areas. A warranty on a membrane alone may exclude the upstands, the…
It should cover what an ordinary person can see and operate, and leave everything requiring instruments, access equipment or technical judgement to the specialists. Record…
Stop asking who is at fault and ask each party what they did, when, and what they observed. Record the answers separately, then ask the party coordinating the work, or an…
Check every door individually for operation, alignment, hardware, sealing and finish, and record each by a fixed door reference. Doors are the most-used moving element in a…
Record the condition of every room at handover, including those you will not use immediately, with photographs and a written note. Unoccupied rooms are where defects go unnoticed…
Record who was responsible before, who is responsible now, from what date, and for which items. Ask both parties to confirm the position in writing, and keep the original…
Ask for a written explanation of why the model differs, a comparison of the two, and confirmation from the designer that the installed unit meets the design requirements. Do not…
Request a dated record of each structural change with drawings showing what was altered, the engineer's confirmation, photographs before covering, and any inspection or test…
Ask for the accounts to be transferred into your name with administrator rights before you accept completion. Where a supplier declines, establish exactly what you cannot do…